When does air recovery belong in a PET blowing system?

Air recovery can reduce the demand placed on parts of the compressed-air system when it is compatible with the blow platform and plant air architecture. Evaluate quality, pressure levels, controls, fallback operation and measured project-specific savings.

Engineers installing utility connections for a water bottling line
Utility connection and installation readiness
Engineers installing utility connections for a water bottling line
Utility connection and installation readiness
Answer first

PET Blow Molding Air Recovery

Air recovery can reduce the demand placed on parts of the compressed-air system when it is compatible with the blow platform and plant air architecture. Evaluate quality, pressure levels, controls, fallback operation and measured project-specific savings. Use the checklist below to turn the question into a supplier-ready decision without relying on universal figures or unverified claims.

  • Blower model
  • Bottle and speed
  • Existing air network
  • Energy measurement basis
Scope decisions

Decisions Behind PET Blow Molding Air Recovery

Define these items against the real product, package, site and production plan before comparing equipment or supplier proposals.

Recovery use

Define where recovered air is allowed

Air quality

Protect each receiving application

Control logic

Plan stable switching and fallback

Business case

Use supplier calculations tied to the real bottle

Supplier comparison

PET Blow Molding Air Recovery Supplier Evidence Matrix

Use the matrix to separate buyer inputs, supplier commitments and evidence that can be checked during design review, FAT, installation or operation.

Decision What to define Evidence to request
Recovery use Define where recovered air is allowed Air-flow diagram
Air quality Protect each receiving application Pressure and quality schedule
Control logic Plan stable switching and fallback Control narrative
Business case Use supplier calculations tied to the real bottle Project-specific consumption comparison
Project inputs

Project Inputs for PET Blow Molding Air Recovery

Incomplete inputs force suppliers to make assumptions. Mark unknown items openly and assign the next action instead of hiding the gap.

Blower model

Provide current, project-specific information for PET blow molding air recovery so the supplier can state assumptions and remaining decisions.

Bottle and speed

Provide current, project-specific information for PET blow molding air recovery so the supplier can state assumptions and remaining decisions.

Existing air network

Provide current, project-specific information for PET blow molding air recovery so the supplier can state assumptions and remaining decisions.

Energy measurement basis

Provide current, project-specific information for PET blow molding air recovery so the supplier can state assumptions and remaining decisions.

Planning questions

FAQ

When does air recovery belong in a PET blowing system?

Air recovery can reduce the demand placed on parts of the compressed-air system when it is compatible with the blow platform and plant air architecture. Evaluate quality, pressure levels, controls, fallback operation and measured project-specific savings.

Which inputs are needed for PET blow molding air recovery?

Start with Blower model, Bottle and speed, Existing air network, Energy measurement basis. The selected supplier and qualified local specialists must confirm the final project basis.

What evidence should a supplier provide for PET blow molding air recovery?

Request Air-flow diagram, Pressure and quality schedule, Control narrative, Project-specific consumption comparison. Compare evidence against the same approved product, package, capacity and site conditions.

What is a common mistake when planning PET blow molding air recovery?

A common mistake is accepting a generic answer without defining the actual bottle, product, output, utilities, interfaces and acceptance method for the project.

How does PET blow molding air recovery connect to a complete water bottling line?

It affects adjacent equipment, controls, utilities, layout, quality checks or operating responsibilities. Record those interfaces in the complete-line scope and responsibility matrix.

Planning calculator: PET air-recovery comparison

Enter measured or explicitly assumed values. Keep the units and measurement boundary consistent. Compare a second scenario before choosing equipment.

Equation and scope

1000A ÷ B; 1000C ÷ D; (1000A ÷ B) − (1000C ÷ D)

  • A: Before: Measured energy [kWh]
  • B: Before: Good bottles [Quantity]
  • C: After: Measured energy [kWh]
  • D: After: Good bottles [Quantity]

⌈x⌉ rounds upward and ⌊x⌋ downward to a whole count. min/max select the lowest/highest sample. ∉ means outside the stated interval.

Compare measured energy per thousand good bottles before and after a change. A reduction is meaningful only when bottle, preform, quality, operating window and meter boundary are comparable. No supplier savings percentage is assumed.

Worked example: editable assumptions

Record assumptions separately from measurements. The example numbers demonstrate arithmetic and are not a recommended equipment specification.

Input or result Value Unit
A — Before: Measured energy 80 kWh
B — Before: Good bottles 20000 Quantity
C — After: Measured energy 65 kWh
D — After: Good bottles 20000 Quantity
Before 4 kWh/1000
After 3.25 kWh/1000
Reduction 0.75 kWh/1000
Reduction 18.75 %

Your project inputs

Calculated result

Input or result Value Unit
Before 4 kWh/1000
After 3.25 kWh/1000
Reduction 0.75 kWh/1000
Reduction 18.75 %

This is a planning estimate from the stated inputs, not a machine guarantee or design approval.

Calculation stays in this browser; this worksheet sends no project inputs to the server.

Before procurement, ask the responsible specialist to review the assumptions, drawings and test evidence. A valid calculation does not mean a project has passed acceptance.

Can lower total energy still mean higher energy per good bottle?

These are invented teaching inputs, not equipment ratings, market prices or an accepted tolerance. The two scenarios change one assumption while holding the other inputs constant. Use the comparison to identify what must be measured or agreed for your project.

Read both inputs and outputs in the stated units. The input register explains what evidence to request before substituting your own values. If a source is missing, record the uncertainty rather than silently entering zero or accepting a supplier estimate as a measurement.

Changed assumption: After: Good bottles

Input assumptions

Record itemUnitScenario AScenario B
Before: Measured energykWh9696
Before: Good bottlesQuantity24,00024,000
After: Measured energykWh7272
After: Good bottlesQuantity24,00016,000

Calculated comparison

Record itemUnitScenario AScenario B
BeforekWh/100044
AfterkWh/100034.5
ReductionkWh/10001-0.5
Reduction%25-12.5

What the comparison means

The after-change energy total remains lower, but the second scenario reduces its good-bottle denominator. The specific energy comparison can therefore reverse direction. Report both energy and accepted output rather than advertising a lower meter reading alone. These invented windows illustrate normalization; they do not establish any air-recovery saving on an actual line.

How to establish this input

Record itemHow to establish this input
Before: Measured energyKeep meter start and finish readings, the measurement period, metered equipment boundary and accepted output record. Include enough information to distinguish a change in consumption from a change in product mix, rejects or running time.
Before: Good bottlesKeep the physical count or usable-stock record for the stated configuration and time. Identify incomplete, blocked, rejected or unavailable stock separately. A total installed capacity is not automatically the quantity available in the comparison.
After: Measured energyKeep meter start and finish readings, the measurement period, metered equipment boundary and accepted output record. Include enough information to distinguish a change in consumption from a change in product mix, rejects or running time.
After: Good bottlesKeep the physical count or usable-stock record for the stated configuration and time. Identify incomplete, blocked, rejected or unavailable stock separately. A total installed capacity is not automatically the quantity available in the comparison.

Evidence to request

Keep meter start and end readings, accepted bottle counts, product format, reject disposition and comparable production windows. Investigate changed operating conditions before attributing a difference to one equipment feature.

Project decision record

Record itemProject decision record
Input assumptionsIdentify the bottle, pack or material configuration, operating mode and measurement boundary. State the start and finish of the observation and which accepted output the comparison represents; unlike boundaries cannot establish a performance improvement.
How to establish this inputMark every input as measured, taken from a drawing, quoted or assumed. Retain the source document identifier, revision, date and responsible person. The same numeral with a different unit or data status is not automatically a comparable input.
Project decision recordAsk the responsible supplier and buyer to agree actual acceptance criteria and the evidence that will demonstrate them. Teaching values and calculated outputs on this page do not become approved operating settings or contractual performance guarantees.
Evidence to requestRecord the decision affected by the result, the measurement or trial still needed, its owner and the next review. Keep unresolved items visible in the handover file instead of changing the figures to make a preferred equipment option appear acceptable.

Download the comparison and evidence register (CSV)

Why can lower total electricity use fail to demonstrate air-recovery savings?

The before-and-after totals must be divided by their own accepted bottle counts. A smaller meter total can simply represent less production. Use the same meter boundary and comparable operating periods, and retain both the absolute specific-use difference and its percentage basis instead of comparing only one headline number.

Which inputs should you verify before using this result?

These are hypothetical sensitivity examples, not measurements from a factory. The lower and higher inputs are chosen for teaching; they are not equipment limits, approved settings, uncertainty intervals or recommended allowances. Whole-count and bounded inputs are adjusted to keep the examples valid, so the changes are not all the same percentage.

Read one input row at a time. For its lower and higher result, only that named input changes; every other input remains at the baseline shown in the first table. Do not combine all the lower columns or all the higher columns into a single operating scenario: those combined conditions have not been calculated here.

Baseline and selected input changes

Input being changedUnitLower inputBaseline inputHigher input
Before: Measured energykWh76.896115.2
Before: Good bottlesQuantity19,20024,00028,800
After: Measured energykWh57.67286.4
After: Good bottlesQuantity19,20024,00028,800

Output when one input changes

Input being changedCalculated outputLower inputBaseline inputHigher input
Before: Measured energyBefore (kWh/1000)3.244.8
Before: Measured energyAfter (kWh/1000)333
Before: Measured energyReduction (kWh/1000)0.211.8
Before: Measured energyReduction (%)6.252537.5
Before: Good bottlesBefore (kWh/1000)543.3333
Before: Good bottlesAfter (kWh/1000)333
Before: Good bottlesReduction (kWh/1000)210.3333
Before: Good bottlesReduction (%)402510
After: Measured energyBefore (kWh/1000)444
After: Measured energyAfter (kWh/1000)2.433.6
After: Measured energyReduction (kWh/1000)1.610.4
After: Measured energyReduction (%)402510
After: Good bottlesBefore (kWh/1000)444
After: Good bottlesAfter (kWh/1000)3.7532.5
After: Good bottlesReduction (kWh/1000)0.2511.5
After: Good bottlesReduction (%)6.252537.5

Interpret this problem

A one-input comparison isolates the arithmetic effect inside this model. It does not establish that the input can change independently on a real line. If two quantities share the same measurement, production period or physical constraint, ask the responsible supplier to review that relationship before changing the project basis.

Equal displayed results need interpretation. Whole-item outputs can remain unchanged until a rounding boundary is crossed; displayed decimal values can also hide a small change. Check the stated unit, the underlying counts and the specific explanation below before concluding that an input has no effect.

What to verify next

Use a surprising difference to choose the next measurement, rather than selecting whichever assumption gives the preferred answer. Record the input label and unit, its measured or assumed status, document revision, operating condition and who will verify it. Keep the original record so a later reader can reproduce the comparison.

For a supplier discussion, take the baseline, one changed input, the affected output and the unresolved question together. Agree the field observation or controlled trial that can resolve it and record the responsible person. A mathematical change does not by itself approve equipment capacity, quality acceptance, installation or a purchase decision.

PET air-recovery comparison

Where do the inputs come from, and which result do they change?

Mark each project value as measured, quoted, taken from a drawing, assumed or awaiting confirmation. Early estimates can use stated assumptions; a missing value is not zero. The calculator defaults are illustrative, not evidence about your plant.

Input or result / UnitEvidence to requestSubstitution to avoid
Before: Measured energy (kWh)Retain the before-period meter identifier, start and finish readings, observation times and included consumers. Identify setup, idle and production energy within that window.A before-period bill or whole-building meter may include unrelated loads. Keep the electrical boundary consistent with the after-period comparison.
Before: Good bottles (Quantity)Record accepted bottles for exactly the before-energy measurement period. Identify the counter location and treatment of rejects, samples and bottles already in the line.Do not divide before-period energy by a nominal nameplate count or by the after-period production quantity. Those substitutions change the specific-energy denominator.
After: Measured energy (kWh)Retain the after-period meter readings and times using the same included equipment as the before case. Document any other operating or equipment changes.A meter reset, different boundary or shorter window can mimic a saving. Keep the raw readings rather than only a reported percentage improvement.
After: Good bottles (Quantity)Reconcile the after-period accepted count with the same start and finish times used for after-energy measurement. Preserve the relevant reject and stock movements.More filled bottles is not necessarily more accepted output. Changing the counting point between periods can distort the normalized comparison even with correct meter readings.

Input-to-result trace

The links below trace each input to the equations that use it. They describe mathematical dependence, not every shared input-validation rule. Retain the source, revision, operating condition and person responsible for each value before comparing offers.

Before: Measured energy (kWh) → Before (kWh/1000); Reduction (kWh/1000); Reduction (%)

Before: Good bottles (Quantity) → Before (kWh/1000); Reduction (kWh/1000); Reduction (%)

After: Measured energy (kWh) → After (kWh/1000); Reduction (kWh/1000); Reduction (%)

After: Good bottles (Quantity) → After (kWh/1000); Reduction (kWh/1000); Reduction (%)

Equations and unit basis

Use the numerical input values in the units shown here. Conversion factors belong to these units. Compare the equation with the calculator result and the example before transferring it to another unit system.

Before (kWh/1000)

Before (kWh/1000) = ((Before: Measured energy ÷ Before: Good bottles) × 1000)

Inputs used in this result: Before: Good bottles (Quantity); Before: Measured energy (kWh).

After (kWh/1000)

After (kWh/1000) = ((After: Measured energy ÷ After: Good bottles) × 1000)

Inputs used in this result: After: Good bottles (Quantity); After: Measured energy (kWh).

Reduction (kWh/1000)

Reduction (kWh/1000) = (((Before: Measured energy ÷ Before: Good bottles) × 1000) − ((After: Measured energy ÷ After: Good bottles) × 1000))

Inputs used in this result: After: Good bottles (Quantity); After: Measured energy (kWh); Before: Good bottles (Quantity); Before: Measured energy (kWh).

Reduction (%)

Reduction (%) = ((((Before: Measured energy ÷ Before: Good bottles) − (After: Measured energy ÷ After: Good bottles)) ÷ (Before: Measured energy ÷ Before: Good bottles)) × 100)

Inputs used in this result: After: Good bottles (Quantity); After: Measured energy (kWh); Before: Good bottles (Quantity); Before: Measured energy (kWh).

Applies when: (Before: Measured energy > 0)

ceil rounds up to a whole count; floor rounds down. min and max select the smallest and largest values. I(P) is 1 when condition P is true, otherwise 0; ∨ means “or”. π is the circle constant. Semicolons separate function arguments.

These relations explain the planning model. A mathematical result does not set acceptance limits, approve a machine setting or establish legal filling tolerances. Keep project approval and evidence separate from arithmetic.

PET air-recovery comparison

After: Measured energy + After: Good bottles: What happens when two planning inputs change together?

Compare four explicitly hypothetical combinations. Only the two named inputs vary; every other input remains fixed. These examples complete the corner cases around the single-input comparisons above. They are teaching assumptions, not measured plant data, recommended settings, approved limits or probability ranges.

Read A as lower/lower, B as lower/higher, C as higher/lower and D as higher/higher, in the displayed input order. A is the comparison origin, not the original project baseline. The two factors are varied independently for this calculation; that does not prove every combination is physically feasible.

Keep the reference case fixed and read the sign. A negative saving means an increase under these assumptions; higher total consumption can coexist with lower consumption per accepted unit.

Calculated results across the four cases

Calculated resultABCD
Before (kWh/1000)4444
After (kWh/1000)324.53
Reduction (kWh/1000)12-0.51
Reduction (%)2550-12.525

Separate and combined changes from A

Calculated resultInput or resultCalculated value
Before (kWh/1000)First input alone: C − A0
Before (kWh/1000)Second input alone: B − A0
Before (kWh/1000)Both inputs: D − A0
Before (kWh/1000)Sum of the two separate changes0
Before (kWh/1000)Combined change minus that sum0
After (kWh/1000)First input alone: C − A1.5
After (kWh/1000)Second input alone: B − A-1
After (kWh/1000)Both inputs: D − A0
After (kWh/1000)Sum of the two separate changes0.5
After (kWh/1000)Combined change minus that sum-0.5
Reduction (kWh/1000)First input alone: C − A-1.5
Reduction (kWh/1000)Second input alone: B − A1
Reduction (kWh/1000)Both inputs: D − A0
Reduction (kWh/1000)Sum of the two separate changes-0.5
Reduction (kWh/1000)Combined change minus that sum0.5
Reduction (percentage points)First input alone: C − A-37.5
Reduction (percentage points)Second input alone: B − A25
Reduction (percentage points)Both inputs: D − A0
Reduction (percentage points)Sum of the two separate changes-12.5
Reduction (percentage points)Combined change minus that sum12.5

The last difference is D − C − B + A, in the output unit. Zero means the four computed values are additive at these selected points; it does not prove independence in a real line. A nonzero difference can follow from multiplication, division or whole-count rounding. It is not a measured machine interaction or a statistical confidence interval.

A direct difference between two percentage results is expressed in percentage points, not as a relative percentage change.

Hypothetical combination A: After: Measured energy = 57.6 kWh; After: Good bottles = 19200 Quantity

Complete inputs for reproducing this case

Input or resultCalculated valueUnit
Before: Measured energy96kWh
Before: Good bottles24000Quantity
After: Measured energy57.6kWh
After: Good bottles19200Quantity

Step-by-step substitution from the stated inputs

Intermediate values display up to six decimal places; calculations retain unrounded values. Reproduce operations from the original inputs. Intermediate numbers do not necessarily have the final result unit. π and whole-count functions follow the model reference. CSV numbers use a decimal point.

Before (kWh/1000)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2(([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) × 1000)
((96 ÷ 24000) × 1000)
4

After (kWh/1000)

Input or resultOperationCalculated value
1(57.6 ÷ 19200)0.003
2(([After: Measured energy: 57.6 kWh] ÷ [After: Good bottles: 19200 Quantity]) × 1000)
((57.6 ÷ 19200) × 1000)
3

Reduction (kWh/1000)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2((96 ÷ 24000) × 1000)4
3(57.6 ÷ 19200)0.003
4((57.6 ÷ 19200) × 1000)3
5((([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) × 1000) − (([After: Measured energy: 57.6 kWh] ÷ [After: Good bottles: 19200 Quantity]) × 1000))
(((96 ÷ 24000) × 1000) − ((57.6 ÷ 19200) × 1000))
1

Reduction (%)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2(57.6 ÷ 19200)0.003
3((96 ÷ 24000) − (57.6 ÷ 19200))0.001
4(((96 ÷ 24000) − (57.6 ÷ 19200)) ÷ (96 ÷ 24000))0.25
5(((([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) − ([After: Measured energy: 57.6 kWh] ÷ [After: Good bottles: 19200 Quantity])) ÷ ([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity])) × 100)
((((96 ÷ 24000) − (57.6 ÷ 19200)) ÷ (96 ÷ 24000)) × 100)
25
Hypothetical combination B: After: Measured energy = 57.6 kWh; After: Good bottles = 28800 Quantity

Complete inputs for reproducing this case

Input or resultCalculated valueUnit
Before: Measured energy96kWh
Before: Good bottles24000Quantity
After: Measured energy57.6kWh
After: Good bottles28800Quantity

Step-by-step substitution from the stated inputs

Intermediate values display up to six decimal places; calculations retain unrounded values. Reproduce operations from the original inputs. Intermediate numbers do not necessarily have the final result unit. π and whole-count functions follow the model reference. CSV numbers use a decimal point.

Before (kWh/1000)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2(([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) × 1000)
((96 ÷ 24000) × 1000)
4

After (kWh/1000)

Input or resultOperationCalculated value
1(57.6 ÷ 28800)0.002
2(([After: Measured energy: 57.6 kWh] ÷ [After: Good bottles: 28800 Quantity]) × 1000)
((57.6 ÷ 28800) × 1000)
2

Reduction (kWh/1000)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2((96 ÷ 24000) × 1000)4
3(57.6 ÷ 28800)0.002
4((57.6 ÷ 28800) × 1000)2
5((([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) × 1000) − (([After: Measured energy: 57.6 kWh] ÷ [After: Good bottles: 28800 Quantity]) × 1000))
(((96 ÷ 24000) × 1000) − ((57.6 ÷ 28800) × 1000))
2

Reduction (%)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2(57.6 ÷ 28800)0.002
3((96 ÷ 24000) − (57.6 ÷ 28800))0.002
4(((96 ÷ 24000) − (57.6 ÷ 28800)) ÷ (96 ÷ 24000))0.5
5(((([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) − ([After: Measured energy: 57.6 kWh] ÷ [After: Good bottles: 28800 Quantity])) ÷ ([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity])) × 100)
((((96 ÷ 24000) − (57.6 ÷ 28800)) ÷ (96 ÷ 24000)) × 100)
50
Hypothetical combination C: After: Measured energy = 86.4 kWh; After: Good bottles = 19200 Quantity

Complete inputs for reproducing this case

Input or resultCalculated valueUnit
Before: Measured energy96kWh
Before: Good bottles24000Quantity
After: Measured energy86.4kWh
After: Good bottles19200Quantity

Step-by-step substitution from the stated inputs

Intermediate values display up to six decimal places; calculations retain unrounded values. Reproduce operations from the original inputs. Intermediate numbers do not necessarily have the final result unit. π and whole-count functions follow the model reference. CSV numbers use a decimal point.

Before (kWh/1000)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2(([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) × 1000)
((96 ÷ 24000) × 1000)
4

After (kWh/1000)

Input or resultOperationCalculated value
1(86.4 ÷ 19200)0.0045
2(([After: Measured energy: 86.4 kWh] ÷ [After: Good bottles: 19200 Quantity]) × 1000)
((86.4 ÷ 19200) × 1000)
4.5

Reduction (kWh/1000)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2((96 ÷ 24000) × 1000)4
3(86.4 ÷ 19200)0.0045
4((86.4 ÷ 19200) × 1000)4.5
5((([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) × 1000) − (([After: Measured energy: 86.4 kWh] ÷ [After: Good bottles: 19200 Quantity]) × 1000))
(((96 ÷ 24000) × 1000) − ((86.4 ÷ 19200) × 1000))
-0.5

Reduction (%)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2(86.4 ÷ 19200)0.0045
3((96 ÷ 24000) − (86.4 ÷ 19200))-0.0005
4(((96 ÷ 24000) − (86.4 ÷ 19200)) ÷ (96 ÷ 24000))-0.125
5(((([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) − ([After: Measured energy: 86.4 kWh] ÷ [After: Good bottles: 19200 Quantity])) ÷ ([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity])) × 100)
((((96 ÷ 24000) − (86.4 ÷ 19200)) ÷ (96 ÷ 24000)) × 100)
-12.5
Hypothetical combination D: After: Measured energy = 86.4 kWh; After: Good bottles = 28800 Quantity

Complete inputs for reproducing this case

Input or resultCalculated valueUnit
Before: Measured energy96kWh
Before: Good bottles24000Quantity
After: Measured energy86.4kWh
After: Good bottles28800Quantity

Step-by-step substitution from the stated inputs

Intermediate values display up to six decimal places; calculations retain unrounded values. Reproduce operations from the original inputs. Intermediate numbers do not necessarily have the final result unit. π and whole-count functions follow the model reference. CSV numbers use a decimal point.

Before (kWh/1000)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2(([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) × 1000)
((96 ÷ 24000) × 1000)
4

After (kWh/1000)

Input or resultOperationCalculated value
1(86.4 ÷ 28800)0.003
2(([After: Measured energy: 86.4 kWh] ÷ [After: Good bottles: 28800 Quantity]) × 1000)
((86.4 ÷ 28800) × 1000)
3

Reduction (kWh/1000)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2((96 ÷ 24000) × 1000)4
3(86.4 ÷ 28800)0.003
4((86.4 ÷ 28800) × 1000)3
5((([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) × 1000) − (([After: Measured energy: 86.4 kWh] ÷ [After: Good bottles: 28800 Quantity]) × 1000))
(((96 ÷ 24000) × 1000) − ((86.4 ÷ 28800) × 1000))
1

Reduction (%)

Input or resultOperationCalculated value
1(96 ÷ 24000)0.004
2(86.4 ÷ 28800)0.003
3((96 ÷ 24000) − (86.4 ÷ 28800))0.001
4(((96 ÷ 24000) − (86.4 ÷ 28800)) ÷ (96 ÷ 24000))0.25
5(((([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity]) − ([After: Measured energy: 86.4 kWh] ÷ [After: Good bottles: 28800 Quantity])) ÷ ([Before: Measured energy: 96 kWh] ÷ [Before: Good bottles: 24000 Quantity])) × 100)
((((96 ÷ 24000) − (86.4 ÷ 28800)) ÷ (96 ÷ 24000)) × 100)
25

Use a differing result to identify the joint operating condition that needs evidence. Ask the supplier to check the combination, fixed assumptions and relevant approval before changing equipment. These calculations do not establish acceptance, safe operating ranges or a guaranteed output.

Download worksheet CSV

PET air-recovery comparison

Choose the next planning task

Compare delivered bottles with fully scoped in-house costs. Check air demand, format changes and bottle trials before choosing the supply route.

Connect this task to the complete line plan

Related planning guides

Plant planning form

Request a PET Blow Molding Air Recovery Scope Review

Share what you know now. The goal is to prepare a useful plant brief before a machine quotation is built.
















Written byMr Kcal, buyer communication and sourcing content
Business context reviewed byAllot Tech Project Desk
Last updatedAugust 19, 2026
Guide basisPlant planning inputs, supplier scope comparison and buyer-side project preparation. No fixed price or unverified project claim is used.