Hypothetical combination,Input or result,Your project inputs / Calculated result,Value,Unit,Operation A,Your project inputs,Usable tank volume,600.0,L, A,Your project inputs,Product flow,2880.0,L/h, A,Step-by-step substitution from the stated inputs,Time (min) / 1,0.20833333333333334,,( [Usable tank volume: 600 L] ÷ [Product flow: 2880 L/h] ) A,Step-by-step substitution from the stated inputs,Time (min) / 2,12.5,min,(( [Usable tank volume: 600 L] ÷ [Product flow: 2880 L/h] ) × 60) A,Calculated result,Time,12.5,min, B,Your project inputs,Usable tank volume,600.0,L, B,Your project inputs,Product flow,4320.0,L/h, B,Step-by-step substitution from the stated inputs,Time (min) / 1,0.1388888888888889,,( [Usable tank volume: 600 L] ÷ [Product flow: 4320 L/h] ) B,Step-by-step substitution from the stated inputs,Time (min) / 2,8.333333333333334,min,(( [Usable tank volume: 600 L] ÷ [Product flow: 4320 L/h] ) × 60) B,Calculated result,Time,8.333333333333334,min, C,Your project inputs,Usable tank volume,900.0,L, C,Your project inputs,Product flow,2880.0,L/h, C,Step-by-step substitution from the stated inputs,Time (min) / 1,0.3125,,( [Usable tank volume: 900 L] ÷ [Product flow: 2880 L/h] ) C,Step-by-step substitution from the stated inputs,Time (min) / 2,18.75,min,(( [Usable tank volume: 900 L] ÷ [Product flow: 2880 L/h] ) × 60) C,Calculated result,Time,18.75,min, D,Your project inputs,Usable tank volume,900.0,L, D,Your project inputs,Product flow,4320.0,L/h, D,Step-by-step substitution from the stated inputs,Time (min) / 1,0.20833333333333334,,( [Usable tank volume: 900 L] ÷ [Product flow: 4320 L/h] ) D,Step-by-step substitution from the stated inputs,Time (min) / 2,12.5,min,(( [Usable tank volume: 900 L] ÷ [Product flow: 4320 L/h] ) × 60) D,Calculated result,Time,12.5,min, A→D,Separate and combined changes from A,Time / First input alone: C − A,6.25,min, A→D,Separate and combined changes from A,Time / Second input alone: B − A,-4.166666666666667,min, A→D,Separate and combined changes from A,Time / Both inputs: D − A,0.0,min, A→D,Separate and combined changes from A,Time / Sum of the two separate changes,2.0833333333333335,min, A→D,Separate and combined changes from A,Time / Combined change minus that sum,-2.0833333333333335,min,