Water Bottling Line Electrical Load Schedule Why do connected electrical load and estimated running demand differ? "These are invented teaching inputs, not equipment ratings, market prices or an accepted tolerance. The two scenarios change one assumption while holding the other inputs constant. Use the comparison to identify what must be measured or agreed for your project." Two planning scenarios Record item,Unit,Scenario A,Scenario B,How to establish this input Connected load 1,kW,40,40,"Identify whether the value is an approved limit, measured reading, setpoint or assumption. Keep the method and relevant record revision together. An instrument indication or a teaching default does not establish the project acceptance criterion." Connected load 2,kW,25,25,"Identify whether the value is an approved limit, measured reading, setpoint or assumption. Keep the method and relevant record revision together. An instrument indication or a teaching default does not establish the project acceptance criterion." Connected load 3,kW,15,15,"Identify whether the value is an approved limit, measured reading, setpoint or assumption. Keep the method and relevant record revision together. An instrument indication or a teaching default does not establish the project acceptance criterion." Simultaneity factor,0…1,0.75,1,"Identify whether the value is an approved limit, measured reading, setpoint or assumption. Keep the method and relevant record revision together. An instrument indication or a teaching default does not establish the project acceptance criterion." Calculated comparison Record item,Unit,Scenario A,Scenario B Connected load,kW,80,80 Power,kW,60,80 What the comparison means,All three connected loads stay unchanged; only the assumed simultaneous-use factor changes. The lower estimate depends on evidence that not all connected loads operate together in that condition. It should not be presented as a smaller installed load. Starting behaviour and electrical protection cannot be selected from this kW comparison. Evidence to request,Build a machine-by-machine schedule identifying operating modes and evidence for simultaneity. Obtain the supplier electrical data and have the responsible electrical designer assess supply and protection. Input assumptions,"Identify the bottle, pack or material configuration, operating mode and measurement boundary. State the start and finish of the observation and which accepted output the comparison represents; unlike boundaries cannot establish a performance improvement." How to establish this input,"Mark every input as measured, taken from a drawing, quoted or assumed. Retain the source document identifier, revision, date and responsible person. The same numeral with a different unit or data status is not automatically a comparable input." Project decision record,Ask the responsible supplier and buyer to agree actual acceptance criteria and the evidence that will demonstrate them. Teaching values and calculated outputs on this page do not become approved operating settings or contractual performance guarantees. Evidence to request,"Record the decision affected by the result, the measurement or trial still needed, its owner and the next review. Keep unresolved items visible in the handover file instead of changing the figures to make a preferred equipment option appear acceptable." Two planning scenarios,"These are invented teaching inputs, not equipment ratings, market prices or an accepted tolerance. The two scenarios change one assumption while holding the other inputs constant. Use the comparison to identify what must be measured or agreed for your project."