Hypothetical combination,Input or result,Your project inputs / Calculated result,Value,Unit,Operation A,Your project inputs,Heat load,28.8,kW, A,Your project inputs,Temperature rise,8.0,K, A,Step-by-step substitution from the stated inputs,Flow (m³/h) / 1,103680.0,,( [Heat load: 28.8 kW] × 3600) A,Step-by-step substitution from the stated inputs,Flow (m³/h) / 2,1.206,,(1.2 × 1.005) A,Step-by-step substitution from the stated inputs,Flow (m³/h) / 3,9.648,,((1.2 × 1.005) × [Temperature rise: 8 K] ) A,Step-by-step substitution from the stated inputs,Flow (m³/h) / 4,10746.268656716418,m³/h,(( [Heat load: 28.8 kW] × 3600) ÷ ((1.2 × 1.005) × [Temperature rise: 8 K] )) A,Calculated result,Flow,10746.268656716418,m³/h, B,Your project inputs,Heat load,28.8,kW, B,Your project inputs,Temperature rise,12.0,K, B,Step-by-step substitution from the stated inputs,Flow (m³/h) / 1,103680.0,,( [Heat load: 28.8 kW] × 3600) B,Step-by-step substitution from the stated inputs,Flow (m³/h) / 2,1.206,,(1.2 × 1.005) B,Step-by-step substitution from the stated inputs,Flow (m³/h) / 3,14.472,,((1.2 × 1.005) × [Temperature rise: 12 K] ) B,Step-by-step substitution from the stated inputs,Flow (m³/h) / 4,7164.179104477612,m³/h,(( [Heat load: 28.8 kW] × 3600) ÷ ((1.2 × 1.005) × [Temperature rise: 12 K] )) B,Calculated result,Flow,7164.179104477612,m³/h, C,Your project inputs,Heat load,43.2,kW, C,Your project inputs,Temperature rise,8.0,K, C,Step-by-step substitution from the stated inputs,Flow (m³/h) / 1,155520.0,,( [Heat load: 43.2 kW] × 3600) C,Step-by-step substitution from the stated inputs,Flow (m³/h) / 2,1.206,,(1.2 × 1.005) C,Step-by-step substitution from the stated inputs,Flow (m³/h) / 3,9.648,,((1.2 × 1.005) × [Temperature rise: 8 K] ) C,Step-by-step substitution from the stated inputs,Flow (m³/h) / 4,16119.402985074626,m³/h,(( [Heat load: 43.2 kW] × 3600) ÷ ((1.2 × 1.005) × [Temperature rise: 8 K] )) C,Calculated result,Flow,16119.402985074626,m³/h, D,Your project inputs,Heat load,43.2,kW, D,Your project inputs,Temperature rise,12.0,K, D,Step-by-step substitution from the stated inputs,Flow (m³/h) / 1,155520.0,,( [Heat load: 43.2 kW] × 3600) D,Step-by-step substitution from the stated inputs,Flow (m³/h) / 2,1.206,,(1.2 × 1.005) D,Step-by-step substitution from the stated inputs,Flow (m³/h) / 3,14.472,,((1.2 × 1.005) × [Temperature rise: 12 K] ) D,Step-by-step substitution from the stated inputs,Flow (m³/h) / 4,10746.268656716418,m³/h,(( [Heat load: 43.2 kW] × 3600) ÷ ((1.2 × 1.005) × [Temperature rise: 12 K] )) D,Calculated result,Flow,10746.268656716418,m³/h, A→D,Separate and combined changes from A,Flow / First input alone: C − A,5373.134328358209,m³/h, A→D,Separate and combined changes from A,Flow / Second input alone: B − A,-3582.089552238806,m³/h, A→D,Separate and combined changes from A,Flow / Both inputs: D − A,0.0,m³/h, A→D,Separate and combined changes from A,Flow / Sum of the two separate changes,1791.044776119403,m³/h, A→D,Separate and combined changes from A,Flow / Combined change minus that sum,-1791.044776119403,m³/h,