Hypothetical combination,Input or result,Your project inputs / Calculated result,Value,Unit,Operation A,Your project inputs,Rinse water per bottle,16.0,mL, A,Your project inputs,Bottle rate,5760.0,Bottles/h, A,Step-by-step substitution from the stated inputs,Flow (L/h) / 1,92160.0,,( [Rinse water per bottle: 16 mL] × [Bottle rate: 5760 Bottles/h] ) A,Step-by-step substitution from the stated inputs,Flow (L/h) / 2,92.16,L/h,(( [Rinse water per bottle: 16 mL] × [Bottle rate: 5760 Bottles/h] ) ÷ 1000) A,Calculated result,Flow,92.16,L/h, B,Your project inputs,Rinse water per bottle,16.0,mL, B,Your project inputs,Bottle rate,8640.0,Bottles/h, B,Step-by-step substitution from the stated inputs,Flow (L/h) / 1,138240.0,,( [Rinse water per bottle: 16 mL] × [Bottle rate: 8640 Bottles/h] ) B,Step-by-step substitution from the stated inputs,Flow (L/h) / 2,138.24,L/h,(( [Rinse water per bottle: 16 mL] × [Bottle rate: 8640 Bottles/h] ) ÷ 1000) B,Calculated result,Flow,138.24,L/h, C,Your project inputs,Rinse water per bottle,24.0,mL, C,Your project inputs,Bottle rate,5760.0,Bottles/h, C,Step-by-step substitution from the stated inputs,Flow (L/h) / 1,138240.0,,( [Rinse water per bottle: 24 mL] × [Bottle rate: 5760 Bottles/h] ) C,Step-by-step substitution from the stated inputs,Flow (L/h) / 2,138.24,L/h,(( [Rinse water per bottle: 24 mL] × [Bottle rate: 5760 Bottles/h] ) ÷ 1000) C,Calculated result,Flow,138.24,L/h, D,Your project inputs,Rinse water per bottle,24.0,mL, D,Your project inputs,Bottle rate,8640.0,Bottles/h, D,Step-by-step substitution from the stated inputs,Flow (L/h) / 1,207360.0,,( [Rinse water per bottle: 24 mL] × [Bottle rate: 8640 Bottles/h] ) D,Step-by-step substitution from the stated inputs,Flow (L/h) / 2,207.36,L/h,(( [Rinse water per bottle: 24 mL] × [Bottle rate: 8640 Bottles/h] ) ÷ 1000) D,Calculated result,Flow,207.36,L/h, A→D,Separate and combined changes from A,Flow / First input alone: C − A,46.08,L/h, A→D,Separate and combined changes from A,Flow / Second input alone: B − A,46.08,L/h, A→D,Separate and combined changes from A,Flow / Both inputs: D − A,115.2,L/h, A→D,Separate and combined changes from A,Flow / Sum of the two separate changes,92.16,L/h, A→D,Separate and combined changes from A,Flow / Combined change minus that sum,23.04,L/h,